SATELLITES-------
TIROS-TIROS III-------
Although one of the cameras failed
twelve days into the mission, photograph quality from the other
camera was excellent and many tropical storms during the 1961
hurricane season were photographed. TIROS III was also credited
with the discovery of Hurricane Esther. TIROS III was operational
for 230 days.
PARTICIPANTS:
NASA, RCA, US Weather Bureau, Barnes Engineering
- This page takes a look at Tiros 3.
|
|
|
|
|